archieve page

Glen Finglas Dam

Posted by Castleadmin

We undertook remedial works on the dam crest and spillway at Glen Finglas Dam. The spillway works included repairs to 42 No. stairs, 3 No. horizontal joints and multiple crack repairs on the spillway. The dam crest works included repairs to 29 No. copes,  11 road joints and a new cantilever section.

Blary Hill Windfarm

Posted by Castleadmin

We carried out specialist grouting works to Nordek turbine bases, located on Blary Hill Windfarm on behalf of I&H Brown. A high strength, non-shrink, free flowing grout was used to secure the turbine base plates and provide the required strength to meet the clients programme.

Engine Yard, Edinburgh

Posted by Castleadmin

Design and installation of a punching shear strengthening solution to an existing soffit slab located within in the new Engine Yard development in Edinburgh.

Loch Katrine Aqueduct

Posted by Castle Group

16km of tunnel refurbishment to Scottish Water’s Loch Katrine Aqueduct. Concrete lined, masonry lined and unlined section of aqueduct.