• Project HandoverJune 2021
  • ClientI & H Brown Limited
  • Contract valueApproximately £100,000
case study
case study
case study
case study
case study case study case study case study

We carried out specialist grouting works to Nordek turbine bases, located on Blary Hill Windfarm on behalf of I&H Brown. A high strength, non-shrink, free flowing grout was used to secure the turbine base plates and provide the required strength to meet the clients programme.

WORKS CARRIED OUT:
  • Each turbine was shuttered to ensure Nordeks base specification was met
  • 6mm ply shutter was secured via bracing to the concrete turbine base and off-set from the base plate
  • Grout testing before each pour as per BS EN 13395-2 2002, to ensure the flowability met the minimum requirements
  • During each pour the workability of the grout was continually monitored to ensure a clean finish was achieved
  • Post-pour the turbine bases were covered to ensure the grout properly cured and cube tests were carried out at 3 day, 7 day and 28 day intervals

CASTLE GROUP SCOTLAND

Case Studies

BEAR
Repair

Trunk Road Network

BEAR Scotland

Repair

Trunk Road Network

BEAR Scotland

Trunk road network maintenance contract for structures between 2003 to 2015 in the NE, NW and SE of Scotland.

Read More arrow
Wellgate Car Park
Repair

Wellgate

Wellgate Car Park, Dundee

Repair

Wellgate

Wellgate Car Park, Dundee

Concrete repairs, anode installation and coating application to decks on level 3 & 5 of Wellgate car park.

Read More arrow
Princes Square
Refurbishment

Glasgow

Princes Square, Glasgow

Refurbishment

Glasgow

Princes Square, Glasgow

Removal of two columns with the replacement of cantilevered columns in the basement of Princes Square glasshouse.

Read More arrow
Aberdeen Music Hall
Refurbishment

Aberdeen

Aberdeen Music Hall

Refurbishment

Aberdeen

Aberdeen Music Hall

Structural refurbishment and improvements to Aberdeen Music Hall.

Read More arrow
St Kentigerns Church
Restoration

Lanark

St Kentigern’s Church

Restoration

Lanark

St Kentigern’s Church

Remedial works to a masonry building that included the reinforcement and waterproofing of masonry arches at St Kentigern’s Church.

Read More arrow
View all Case Studies